SOLECTRON, Cherry Street, Newark
This 45,000 SF new concrete tilt-up was a fast-track design-build project for Hillhouse. The high-bay R & D facility employs a structural steel frame, a steel truss roof system, and an interior mezzanine system.
This 45,000 SF new concrete tilt-up was a fast-track design-build project for Hillhouse. The high-bay R & D facility employs a structural steel frame, a steel truss roof system, and an interior mezzanine system.